Seven steps, in the order they actually happen

Remodeling goes wrong in the sequence more often than in the craftsmanship. This is the order we work in and why each step sits where it does.

  1. 01

    The call

    You describe the room, the age of the house and what you want changed. We tell you on the phone whether it is the kind of job we take.

    • Bring the age of the house if you know it — a 1965 ranch and a 2004 two-storey are different jobs.
    • Photos sent ahead save a visit if the scope is simple.
    • If it is an emergency, say so. That gets handled differently and at any hour.
  2. 02

    The walkthrough

    We come out, measure, and look at the things that decide the price: the floor, the walls, what is above the ceiling and where the plumbing already is.

    • We check the floor for level before anything else, because on Gulf Coast clay it is rarely flat and it changes how cabinets and tile get set.
    • We look for the constraints you cannot see: bearing walls, a post-tension slab, duct runs, panel capacity.
    • You get told what is straightforward and what is not, on the spot.
    A load-bearing wall opened between a kitchen and living room, with temporary posts and a new header carrying the span
    Opening a bearing wall between the kitchen and living room, posts and header carrying the load.
  3. 03

    The estimate

    A written scope with the work broken out, so you can see what each part costs and decide what stays in. Free, and yours to take to another contractor if you want a comparison.

    • Line items, not one number. If the budget is tight you need to know what to cut.
    • Allowances for anything you have not chosen yet are stated as allowances, not buried.
    • Anything we genuinely cannot price until a wall is open is flagged as exactly that.
  4. 04

    Scheduling and permits

    Order dates drive the calendar. Cabinets and countertops have lead times that do not care about your start date, so those go in early.

    • Where the scope needs a permit, we confirm which office has jurisdiction over your address and what it requires.
    • HOA architectural review is a separate approval and it is often the slower one. It gets started early.
    • We do not start demolition on a job we cannot finish.
  5. 05

    Protection and demolition

    Floors and doorways get protected, the work area gets sealed, and only then does anything come apart.

    • Plastic and zipper doors on the openings, hard protection on the path in and out.
    • Most homeowners stay in the house. We plan the water-off windows around you.
    • What comes out of the wall gets shown to you before anything covers it again.
    Kitchen demolition in progress with the soffit removed, ceiling opened and wall studs and batt insulation exposed
    Demo day: soffits down, ceiling opened, wiring and insulation exposed for inspection.
  6. 06

    Rough-in and structure

    Framing changes, headers, blocking, and the electrical and plumbing rough-in. On permitted work, this is what gets inspected before it is closed up.

    • Permit-required electrical and plumbing goes to the licensed trades allowed to do it.
    • Blocking goes in for anything that will hang on a wall later — grab bars, floating vanities, heavy uppers.
    • Nothing gets covered until it has been looked at.
    Ceiling framing exposed down to the joists during a remodel, with new lumber, wiring runs and work ladders in place
    Ceiling opened to the joists so new lighting circuits could be run before rock went back up.
  7. 07

    Finishes and the punch list

    Board, tape, texture, paint, flooring, cabinets, counters, tile and trim, in that order. Then we walk it with you under a raking light and fix what you find.

    • Texture is matched to the rest of the house, not just to the patch.
    • The walkthrough happens before the last payment, not after.
    • Punch items get done. That is the part most people have been burned on before.
    Finished beadboard wainscoting with a chair rail and recessed panel base, above a grey wood-look tile floor
    Beadboard wainscoting, chair rail and recessed panel base over wood-look tile.

Common questions

About working with us

Every question on the site

Do I have to move out during the work?

Most homeowners stay. The work area is sealed off with plastic and zipper doors, and the path in and out is protected. For a kitchen you will want a temporary setup elsewhere in the house with the refrigerator and a microwave, because the range and sink are out of service for most of the job.

When do I pay?

Payment terms are set out in the written scope before anything starts, and the final walkthrough happens before the last payment rather than after it. If a change comes up mid-job, it is priced and agreed before the work is done, not added to the invoice at the end.

What happens if you find something behind the wall?

You get a photo and a price before it is covered back up. Rot at a bottom plate, termite damage, a leaking supply line or wiring that will not pass are all things that turn up in older Houston homes, and none of them can be priced honestly before the wall is open.

Can I supply my own materials?

Often, yes, and it is worth discussing at the estimate. The things worth knowing are that lead times become yours to manage, and that a material fault in an owner-supplied product is not something a contractor can warrant the installation against. We will tell you where it makes sense and where it usually does not.

How quickly can you start?

That depends on what is already scheduled and on lead times for anything ordered. Call (281) 883-9927 and we will give you a real answer rather than a hopeful one.

Free estimates

Step one is a phone call

Call and talk to someone who has been doing this for 15+ years. We will look at the space, tell you what the work actually involves, and put a number on it — at no cost.

(281) 883-9927Request a free estimate

Monday – Friday, 8:00 AM – 5:00 PM
Emergencies answered 24/7

Call nowFree estimate